Brand Name: | Product's brand provided at your need. |
Model Number: | There is no specific model. The production of all products is processed according to the CAD drawings provided by customers. |
MOQ: | It depends on the actual situation of the product. |
Price: | It depends on the quantity of the products and the production and processing technology. |
Delivery Time: | Generally, it is within one month. The actual situation shall be subject to the quantity of the order and the degree of difficulty of the product production process. |
Payment Terms: | T/T |
Welding Method
|
Suitable Materials
|
Weld Efficiency
|
Max Weld Length
|
Quality Control Measures
|
Plasma Arc Welding
|
High-Alloy Steels, Nickel Alloys
|
95% weld penetration
|
6m
|
Visual inspection + pressure testing
|
Resistance Welding
|
Low-Carbon Steel, Galvanized Sheets
|
120 welds/min
|
0.5m
|
Dynamic resistance monitoring
|
Friction Stir Welding
|
Aluminum Alloys (5000, 6000 series)
|
8m/min
|
4m
|
Ultrasonic testing post-weld
|
Gas Tungsten Arc Welding (GTAW)
|
Titanium, Zirconium
|
2m/min
|
3m
|
X-ray inspection for critical parts
|
Brand Name: | Product's brand provided at your need. |
Model Number: | There is no specific model. The production of all products is processed according to the CAD drawings provided by customers. |
MOQ: | It depends on the actual situation of the product. |
Price: | It depends on the quantity of the products and the production and processing technology. |
Packaging Details: | It depends on the actual requirements of the product. |
Payment Terms: | T/T |
Welding Method
|
Suitable Materials
|
Weld Efficiency
|
Max Weld Length
|
Quality Control Measures
|
Plasma Arc Welding
|
High-Alloy Steels, Nickel Alloys
|
95% weld penetration
|
6m
|
Visual inspection + pressure testing
|
Resistance Welding
|
Low-Carbon Steel, Galvanized Sheets
|
120 welds/min
|
0.5m
|
Dynamic resistance monitoring
|
Friction Stir Welding
|
Aluminum Alloys (5000, 6000 series)
|
8m/min
|
4m
|
Ultrasonic testing post-weld
|
Gas Tungsten Arc Welding (GTAW)
|
Titanium, Zirconium
|
2m/min
|
3m
|
X-ray inspection for critical parts
|